Victron Energy agreed what the PIM had to do, then selected the platform and the implementation partner and started the build. There was no idle gap between the decision and the brief. The company is a Dutch manufacturer of independent power systems: solar chargers, inverters, battery monitors and energy storage, with more than 50 years of engineering behind it. PIMvendors did the business analysis, the alignment across four teams, and an independent shortlist scored on the same criteria.

Client Introduction

Victron sells into marine, off-grid living, energy storage, professional vehicles and telecom infrastructure. The catalogue is technical. Hundreds of products, across categories, each with specifications, datasheets, certifications and multi-language content for a worldwide dealer network. One inverter-charger carries dozens of technical attributes, compatibility rules, downloadable firmware, installation manuals and certifications that differ by market.

The Challenge

The old setup could not carry that catalogue across channels, languages and customer segments. Victron already believed a PIM was the right class of system. The teams did not share a picture of the job. Engineering wanted technical accuracy and data structures. Marketing wanted rich content for the site and for dealer material. Sales wanted current product information, faster. IT needed a system that would sit cleanly next to the ERP and the web platform.

A selection run on four briefs at once either picks the wrong tool or circles. Victron had watched other companies do that and wanted a single roadmap before the vendors arrived.

The Solution

The business analysis documented Victron's actual product data requirements. It was a priority order, by team, of what had to happen. Data flows were mapped, the pain was named, and the effort spent on manual workarounds was quantified, so the company had one fact base.

Alignment sessions then brought engineering, marketing, sales and IT onto one PIM roadmap. Phase one was defined. Later phases were named and left for later, so one department's list did not become the whole project.

The shortlist was independent and built on fit: technical data, integrations, scale, and the rich multi-format content Victron's products need. Every vendor was scored on the same criteria.

The Results

Victron selected a PIM platform and an implementation partner and moved into implementation straight away. The roadmap already said what phase one was. The requirements were written down. The partner had a brief on day one.

The trade-off is whose request waits. A roadmap with a real phase one tells marketing, or engineering, that part of their list is not in the first release. That is uncomfortable in the room and cheaper than a PIM configured for four unfinished briefs.

The brief is the lesson. Analysis, then one roadmap, then a shortlist, then the partner in the same motion. How to select a PIM is the shortlist step, and it only stays short when the four teams have already agreed the criteria. PIM features and capabilities is the technical depth an inverter-charger demands, from attributes to files and certifications. The PIM implementation guide is why the partner was chosen with the platform, so the build started on a written phase one. Where ERP stops and PIM starts is the boundary IT needed, because the PIM had to sit next to the ERP and the web platform without taking their jobs.

Diagnostic

Do you actually need a PIM?

Run the complexity index before you budget software or hire an SI.